We changed our lines from the Bavaria installed 12mm to a slimmer, lighter 10mm and it has made a huge difference to the ease of reefing...
How did you work out how much you needed?
Hi Nigel,
I have done the same, replace the 12mm to 10mm. It is realy much easier to handle.
The way of me was to se a pilot line at the end of the line at the mast. it is to short to come out alone. Then remove the end of the boom , and pull out the line. But be very careful, you will loose a small roll which is not locked to the "schlitten". there are 4 peaces of it, be very careful, I lost one and have to rebuy.
Then you se, the line with the pilot line is sewed to the "schlitten" . I removed it and put the new one in. Then I sewed a long an at the other line, pulled it thru the boom and put the "schlitten back in the boom. Be carefull not to drill the lines.
Thats all, same procedure with reef 2
Good look!