Hi all,
I am planning to remove the old caulking from the teak in the cockpit and apply the new caulking. After removing the old caulking and applying the new caulking to the gaps between teaks, I just wondering how long if any I need to wait for before I remove the excessive new caulking ?
Thanks a lot.