hi all
This is the latest update on work being done on Pogo
1. Hot water system now complete. Glad we now have both and cold hot water
2. new shower head fitted in transom
3.both aft cabins been thoroughly cleaned and extensively dried out.
4. Mattresses been sent away for getting new ones made.
5. Usb port ,cigarette lighter combo fitted to chart panel
6.all d shackles removed resealed, replaced all nuts with stainless nylocks.
7. windex fitted on mast
8. wind speed and direction instrument fitted on mast
9. mast repaired. 40 mm cut off bottom of mast, mast resleaved up to a metre high,some rigging replaced .
10. yeahhh must refitted. pogo now looks like a boat.
11. a few more halyards to be replaced then she is ready for the splash.
will post new updates next month. special thanks to all info supplied by this forum, Paul Carey for the great work done on rigging, and my darling wife and kids for help and encouragement given
kind regards
Abby